Calculate restoration and maintenance costs accurately
Select categories to calculate their costs
| Item | Required Quantity | Unit |
|---|---|---|
| Waste Removal and Site Cleaning | Lump Sum | |
| grass and Tree Removal | m² | |
| Excavation, Leveling, and Floor Removal | m² | |
| Removal of Old Pipes and Devices | m² | |
| Lime Concrete and Injection for Foundations | Meter |
| Item | Required Quantity | Unit |
|---|---|---|
| Supply and Execute Clay Walls | m² | |
| Supply and Install Wooden Panels | m² | |
| Supply and Install Stone Flooring | m² | |
| Supply and Prepare Stone Building | m² | |
| Remove Wooden Roofs | m² | |
| Supply and Execute Wooden Bench | m² | |
| Supply and Execute Clay Bench | m² | |
| Supply and Install Wooden Beams | Meter | |
| Remove Floor Tiles | m² | |
| Reinforce and Support Columns | m² | |
| Reinforce and Support Doors and Windows | Count | |
| Remove Dangerous Roofs | m² | |
| the crumbling walls | m³ | |
| Remove Wall Tiles | m² | |
| Supply and Execute Metal Supports | Ton | |
| Supply and Install Metal Pegs | Count | |
| Supply and Build Clay Walls | m³ | |
| Repair Cut and Defective Parts | Meter | |
| Supply and Prepare Stone Building | m³ | |
| Build Columns with Stone Pieces | Count | |
| Reinforce and Support Doors and Windows | Count | |
| Fill Large Cracks with Stone | Meter |
| Item | Required Quantity | Unit |
|---|---|---|
| Supply and Install Heritage Wooden Roofs (Athel Wood) | m² | |
| Treatment of Existing Wooden Roofs and Replacement of Damaged Wood and Reapplication of Roof Layers | m² | |
| Treatment of Existing Building Surfaces and Refurbishment | m² | |
| Rebuilding Wall According to Specifications | m² | |
| Treatment of Existing Walls and Refurbishment | m² | |
| Treatment of Wooden Windows and Refurbishment | m² | |
| Supply and Install Heritage Wooden Windows | m² | |
| Supply and Install Heritage Wooden Doors | m² | |
| Restoration and Maintenance of Old Wooden Shelves | m² | |
| Supply and Install New Wooden Shelves | m² | |
| Supply and Execute Wooden Shadings | m³ | |
| Restoration and Repair of Wooden Doors | m² |
| Item | Required Quantity | Unit |
|---|---|---|
| Supply and Execute Lime Plaster for Interior Walls | m² | |
| Colors Painting According to Heritage (Qat Asiri) | m² | |
| Supply and Execute Moisture-Proof Layer for Surfaces | m² | |
| Supply and Execute Interior and Exterior Painting | m² | |
| Supply and Install Waterproofing Layer for Roofs | m² | |
| Maintenance of Qat Asiri Drawings | m² | |
| Restoration, Cleaning, and Treatment of Stones | m² | |
| Treatment of Floors and Replacement of Weak Parts with Lime Bench | m² |
| Item | Required Quantity | Unit |
|---|---|---|
| Supply and Install Sub Distribution Board for the Building | Count | |
| Supply and Install 10 Amp Light Switch (2 Terminals) | Count | |
| Supply and Install 45 Amp Break Switch | Count | |
| Supply and Install 13 Amp Power Socket (With Cover) | Count | |
| Supply and Install Double Ground Socket 13 Amp | Count | |
| Supply and Install Pipes with Diameter (50 mm, 100 mm - 150 mm) | Count | |
| Execute Electric Inspection Rooms (100 cm x 100 cm) | Count | |
| Supply Circular LED Lighting Unit (4000 Kelvin) | Count | |
| Supply Linear LED Lighting Unit (3000 Kelvin) | Count | |
| Supply and Install Ground System | Count | |
| Change Electric Feed from 127 to 380 | Count | |
| Maintenance of Electric Board with Switch (-400-) Amps | Count | |
| Maintenance of Board with Switch (150-125-100-80-60-40-32) Amps | Count | |
| Maintenance of Electric Cables | m | |
| Maintenance of Switches | Count | |
| Maintenance of Lighting Units | Count | |
| Supply and Install Light Switches | Count | |
| Supply and Install Electric Switches | Count | |
| Supply and Install Interior Lighting Units in Heritage Style Including Wires and Installations | Count | |
| Supply and Install Exterior Lighting Units in Heritage Style Including Wires and Installations | Count | |
| Supply and Install 3*3 Copper Light Exit | Count | |
| Supply and Install 3*4 Power Socket | Count | |
| Supply and Install 3*6 Air Conditioning Exit | Count | |
| Supply and Install 3*6 Copper Power Exit | Count | |
| Supply and Install Solar Energy Distribution Board | Count |
| Item | Required Quantity | Unit |
|---|---|---|
| Removal of Old Installations | m | |
| Supply and Install Ferangi Toilet | Count | |
| Supply and Install Hand Wash Basin | Count | |
| Supply and Install Kitchen Sink | Count | |
| Supply and Install Arab Toilet | Count | |
| Water Heater | Count | |
| Supply and Install Ground Siphon | Count | |
| Roof Surface drainage filter | Count | |
| Supply and Install drainage Pipe Diameter 160mm & 75mm | m | |
| Inspection Chambers Work | Count | |
| Create and Execute Pit | Count | |
| Dismantle and Remove Old Installations | m² | |
| Excavation Work for Trenches | m³ | |
| Pipe Extension Diameter 75mm & 32mm | m | |
| Supply and Install 1.5 HP Pump | Count | |
| Supply and Install 3 Cubic Meter Water Tank | Count | |
| Supply Pipes 110mm | m | |
| Dismantle and Remove Worn Installations and Devices | m² | |
| Supply and Install Rainwater Drainage System (Wooden Gutter) | m | |
| Maintenance and Treatment of Rainwater Drainage Systems | m | |
| Supply and Install Sewage Pipes | m | |
| Supply and Install Waterproofing Layer for Roofs | m² |
| Item | Required Quantity | Unit |
|---|---|---|
| Supply and Install Wood Stairs | m | |
| Supply and Install Metal Stairs | m | |
| Repair, Cleaning, and Strengthening Handrails | m | |
| Repair Stairs | m |
| Item | Required Quantity | Unit |
|---|---|---|
| Supply and Install Safety Barriers | Count | |
| Supply Fire Extinguishers (Powder, 6kg) | Count | |
| Supply Fire Extinguishers (CO2) | Count | |
| Supply and Install Fire Alarm System | Count | |
| Supply and Install Single Fire Box (FHC) | Count | |
| Supply and Install Safety Signs | Count | |
| Supply and Install Emergency Lighting System | Count |
| Item | Required Quantity | Unit |
|---|---|---|
| Supply and Install Outdoor Sidewalks (Tiles) | m² | |
| Supply and Install Outdoor Sidewalks (Stones) | m² | |
| Supply and Plant Decoration Plants | Count | |
| Supply and Install Outdoor Seating (4 Chairs with Parasol) | Count | |
| Supply and Plant Grass | m² | |
| Supply and Install Outdoor Garden Seats | Count | |
| Supply and Install Outdoor Fence | m | |
| Supply and Install Automatic Irrigation System | Count |
| Item | Required Quantity | Unit |
|---|---|---|
| Supply and Install Air Conditioner Unit (18000) BTU | Count | |
| Supply and Install Air Conditioner Unit (24000) BTU | Count | |
| Supply and Install Air Conditioner Unit (30000) BTU | Count | |
| Supply and Install Air Conditioner Unit (36000) BTU | Count | |
| Supply and Install Package Air Conditioner Unit (60000) BTU | Count | |
| Ceiling Fan (150 CFM) | Count | |
| Supply and Install Split Air Conditioner Unit (48000) BTU | Count |